Review a project pull request
Review a change request to decide whether a workflow version is ready for release. Inspect the changes and run the proposed workflow before you approve it.
Before you start
Ask the author to include the expected behavior, test inputs, and target project or stage. Use Project version history and diffs to read the comparison, and involve the workflow builder if you cannot explain a changed node or connection before approving it.
You need permission to approve the change request.
Inspect the proposed changes
Open a pending request and select View drafted changes.

Read the description and inspect the node changes before making a decision.
Select Edges to review connection changes separately.

Check whether the proposed wiring changes the path taken by inputs or outputs.
Approve the request
Select Approve pull request and read the confirmation.

Approval can replace the published version, so verify the target and complete change before confirming.
Verify the release
Open Approved after the decision completes and locate the request.

Confirm its status and reviewer information in the saved history.
Open the published interface in a fresh conversation and submit a representative request.

Verify the released behavior from the actual response.
Test the candidate and send back an unsafe change
Open the request's review workspace from View drafted changes or Review, then run representative input there and inspect Output. Check that you are testing the request's proposed version rather than the current editor draft. For a staged release, open Deployments → View PRs → Review; the fuller stage-specific procedure is in Deployments and approval requirements.
Before deciding, review changed instructions, nodes, connections, configuration references, and the intended target. Record the test input, expected behavior, and observed result in a request comment so the author can reproduce any problem.
If the candidate is not ready, submit the comment and choose Reject Changes in the review panel. Verify the request appears as Rejected. A comment alone does not reject it. The author should correct the working draft, rerun the checks, and submit a new request for the intended version and target. Do not approve a request merely to unblock that correction cycle.
If the live check fails after approval, record the affected stage and version. For staged deployments, follow the Recover a stage after a failed release steps in Deployments and approval requirements. For a project without staged deployment, prepare and test a corrective draft and publish it through its normal approval process. If access must stop while the problem is resolved, an authorized owner can deliberately unpublish the interface using Publish and unpublish a project; this creates downtime.
Important behavior
Approval can replace the published workflow version. Check the target stage and proposed changes before you approve.
Last updated
Was this helpful?

